Lord & Burnham Installation Instructions - Page 18Protection From Rainfall
Occasionally, it is necessary to install on ORLYT with the interior floor below outside grade.This is generally a Lean-to, and installation in this manner is necessary to fit the ridge under a roof overhang.
In installations of this type, provision for drainage must be included - either in the form of a dry well in the areaway into the greenhouse and/or drain tiles to dry wells around the inside perimeter of the greenhouse.
In extreme cases (heavy clay soil), a dry well and a sump pump may be required.
Greenhouse Protection in Snow Country
If a Lean-to greenhouse must be installed under a sloping roof, precautions must be taken to prevent damage from sliding snow and ice:
|


